Wastewater Treatment Facility Upgrade

Jun 25, 2018

KPI Technology served as the prime engineer for a $15 million dollar wastewater facility upgrade to meet the more stringent discharge limits and nutrient cap loadings to maintain compliance with the Chesapeake Bay Tributary Strategy regulations.  This successful project also increased the hydraulic capacity of the facility from 0.4 MGD to 0.9 MGD.  Other key components added in the upgrade included a new headworks building containing a new influent screen and pump station, two Sequencing Batch Reactors with post-equalization, a UV disinfection system, two new digesters and an emergency effluent pumping station.  In addition, the existing wastewater treatment facility was converted into side stream equalization.