Dillsburg Borough – South Second Street Reconstruction

Aug 22, 2017

As representative to Borough Council Tim served as project manager for the planning of the reconstruction of South Second Street. South Second Street at one time served as Route 15 and contains substantial reinforced concrete and contains substantial defects in cross slope which required a detailed engineering assessment. Engineering services involved assessment/core drilling of the street, correcting cross slope problems with design of a concrete step curb, design of new drainage system, sidewalks, street trees surveying, and construction management services. CDBG funds were utilized for completion of this project.